What is the Seine-Nord Europe Canal? What are its objectives and its ambition at the heart of the Region, France and Europe?
Discover the commitments behind the Canal
Find here the structural commitments of the Société du Canal Seine-Nord Europe and the project partners.
The Canal at home
Do you want to find out about the project closest to you? Find the information that concerns you on the site of your territory.
Home > News and events > 4 questions for Doriane Ferdinand
I work as a project manager within the Locks and Systems technical department . This is a cross-functional department that oversees, among other things, the construction of six locks*, located along the Canal's route. We work with the teams in each sector and in conjunction with all the relevant departments: archaeology, environment, land management, procurement, etc. I am specifically responsible for monitoring the construction of the Noyon lock, located west of the town.
For the moment, my mission consists of managing the markets necessary for the construction of the lock and ensuring the proper organization of the work through project management. We are currently organizing the preparatory work – that is to say the projects to be carried out upstream of the construction of the Noyon lock, such as the construction of a quay works which should begin in the last half of 2024. I also manage the relations with concessionaires in charge of moving water or electricity networks for example, or monitoring the installation of piezometers, monitoring tools allowing the control of groundwater levels during the work.
“All the structures are adapted to the large-scale Canal, allowing the passage of boats measuring up to 185 m long and 11,4 m wide. ”
The construction of the Canal is organized into 4 geographical sectors and 2 “works” sectors: for the “Locks and Systems”* and the “Somme Canal Bridge”. The latter concern specific works distinct from the current sections of the Canal, which justify management within dedicated departments. Concerning the locks, this makes it possible to homogenize and standardize the construction techniques during the works phase, but also the maintenance principles for the future operator. Each of the structures will have its particularities – different fall height and volume of water for example – as well as its own identity, but the Canal locks nevertheless follow broadly the same design principles.
No, because the water necessary for the operation of the structures is entirely recycled. The locks were designed in compliance with ambitious environmental criteria, in particular to preserve water resources. They operate with savings basins which save up to two-thirds of the water when boats pass by. The remaining third is pumped back to the upper reach.
* Excluding the Montmacq – Cambronne-lès-Ribécourt lock, integrated into sector 1.