The Seine-Nord Europe Canal Company (SCSNE) notified this Monday, September 30, the contracts concerning the construction of two works quays, in Noyon in Oise and in Aubencheul-au-Bac in the North. The start of these works is planned for the first quarter of 1. These works quays will be available to the future companies mandated by the contracts […]
The Société du Canal Seine-Nord Europe notified on Friday December 22, 2023 the first of three lots for the works contract for the Montmacq-Cambronne-lès-Ribécourt lock. This was awarded to a group of 8 companies whose representative is Bouygues Travaux Publics Régions France SAS. This contract will be executed over a forecast period of 55 months […]
The TOARC (Earthworks, Works of Art and Communication Restorations) contract for sector 1 between Compiègne and Passel has just been published for lot 1. The services covered by this contract concern all the works and associated services necessary for the construction of the upstream and downstream reaches and ancillary works for sector 1 (from […]
The Hauts-de-France Region, the CCI Hauts-de-France and the Société du Canal Seine-Nord Europe, invite companies to the regional meetings of Canal Entreprises on Monday June 26, 2023 from 14 p.m. to 17 p.m. at the CCI Hauts-de-France , 299 bd from Leeds to Lille. On the program: Welcome from Philippe Hourdain, President of the CCI Hauts-de-France Interventions […]
7 months of work from June 5 The Société du Canal Seine-Nord Europe notified the contract concerning the work on the temporary quay in Allaines. This was awarded to the GUINTOLI (agent) / NGE Foundation group. This market will run over a provisional period of 7 months for a total amount of nearly […]
The Somme Canal Bridge is an emblematic structure of the Seine-Nord Europe Canal on which boats will navigate to cross the Somme valley between Cléry-sur-Somme, Biaches and Péronne. The detailed design of this work begins now, with the launch of the design-build procedure (COREA).
The Seine-Nord Europe Canal Company has notified the project management contracts for the design and monitoring of the earthworks, engineering structures and communication restorations (road and rail bridges) of the Seine-Nord Europe Canal for sectors 2, 3 and 4 (from Passel to Aubencheul-au-Bac). Sectors 2 (from Passel […]