Learn more about the Seine-Nord Europe Canal

What is the Seine-Nord Europe Canal? What are its objectives and its ambition at the heart of the Region, France and Europe? 

The Canal at home

Do you want to find out about the project closest to you? Find the information that concerns you on the site of your territory.

Publication of the TOARC lot 1 market on sector 1

Posted on 21 July 2023

The TOARC market (Earthworks, Works of Art and Communication Restorations) of sector 1 between Compiègne and Passel has just been published for the lot 1. The services covered by this contract concern all the works and associated services necessary for the construction of the upstream and downstream reaches and ancillary works for sector 1 (from Compiègne to Passel) of the Seine-Nord Europe Canal construction project. (see details below).

The deadline for receipt of applications is August 28, 2023 at 17:00 p.m.

Lot 1 includes the following construction works and associated services:

  • the downstream and upstream reaches (earthworks including bank defences, etc.),
  • the watertightness of the forebay,
  • the 2 foreports of the lock including 2 waiting posts,
  • the guide booms on either side of the lock,
  • the sheet pile supports on the 2 reaches,
  • the back quays at Ribécourt-Dreslincourt and Pimprez,
  • the rescindings of the Oise (Muids, Pimprez),
  • the Confluence of the Oise (except the weirs located upstream which will be the subject of lot 166),
  • the Pimprez weir,
  • the 5 siphons on the forebay (including the upstream and downstream channels),
  • extension of the Ru du Matz siphon,
  • road restorations,
  • the pavement of the service roads (only bituminous concrete to the right of the lock),
  • the restoration of agricultural roads,
  • river equipment on the quays and along the diversion bays,
  • the drainage systems along the diversion bays,
  • the construction of the sites of the final deposits and fillings (ponds of Chiry-Ourscamp, dead arms…),
  • management of temporary sites,
  • the preparation / development of backfill materials,
  • the preparation of the fine earthwork for planting, soil modeling, substrates,
  • the management of interfaces with Lots 162 to 166.